The value of a warehouse solar system depends on when electricity is used, who benefits under the lease and how future fleet charging will operate. A large roof provides installation space, but these factors determine how much of that space is worth using.
Proposed federal support for larger systems gives Victorian warehouse owners and logistics operators a reason to revisit solar, with system size assessed against demand and tenure.
Start with the electricity used during daylight
A storage warehouse using efficient lighting can have a very different electricity profile from an automated distribution centre. Conveyors, refrigeration, workshops and material-handling equipment change both the amount and timing of demand.
| Facility profile | What determines the solar opportunity |
|---|---|
| Ambient storage warehouse | Daytime lighting and equipment loads, quiet periods and the value of surplus generation. |
| Automated distribution centre | Conveyor and sorting schedules, shift changes and planned automation. |
| Temperature-controlled warehouse | Daytime refrigeration demand, seasonal variation and the electricity still needed overnight. |
| Fleet depot | Vehicle arrival times, charging windows, workshop loads and available electrical capacity. |
Solar self-consumption is the share of generation used on site. When avoided grid usage charges exceed the export rate, using more solar on site increases its value. Some commercial contracts provide no export payment.
MEG can assess this match using interval data, bills and operating schedules. The Australian Government’s solar guidance for businesses also recommends interval data. Include planned lighting or equipment upgrades when modelling future demand.
How on site use changes the financial result
Consider two hypothetical 300 kW systems, each generating 400,000 kWh annually. Assume an installed cost of $300,000 before incentives, electricity usage savings of 20 cents per kWh, an export rate of 4 cents per kWh and annual maintenance and monitoring of $3,000. All amounts exclude GST.
These are modelling assumptions, not an MEG quote or project forecast. Both scenarios assume all surplus generation can be exported without curtailment.
| Annual measure | 40% used on site | 80% used on site |
|---|---|---|
| Solar electricity used on site | 160,000 kWh | 320,000 kWh |
| Avoided electricity usage charges | $32,000 | $64,000 |
| Export income | $9,600 | $3,200 |
| Net benefit after maintenance | $38,600 | $64,200 |
| Simple payback before incentives | 7.8 years | 4.7 years |
Higher on-site use increases the annual net benefit by $25,600 under these assumptions. Any additional roof capacity needs assessment against the extra electricity the facility can use or export.
Simple payback divides installed cost by the first-year net benefit, held constant. Incentives, finance, tax, degradation, tariff changes, equipment replacement and demand-charge savings are excluded here and need separate assessment.
Agree how the lease allocates costs and benefits
A landlord funding solar needs an agreed return. The tenant needs to understand the electricity savings remaining after any payments for the system.
The Australian Government’s guidance for rented business premises explains the need for permission and a written agreement covering ownership, costs, maintenance and the end of the lease. Strata properties can also require owners’ corporation consent.
Resolve the following before committing to the project:
- Property rights: permission to use the roof, install equipment and access it for maintenance or future roof works.
- Electricity and payments: which meter receives the solar, who holds the account, who funds the system and how savings or export credits are allocated.
- Lease duration and exit: remaining tenure, renewal options, system ownership on departure and any removal or make-good obligations.
- Ongoing responsibilities: maintenance, insurance, monitoring access and costs if the roof needs repair.
A five-year payback needs closer scrutiny if the tenant has three years remaining and no agreed transfer or compensation arrangement. Model the investor’s cash flows over its actual commitment period.
To assess the site and ownership arrangements together, . Start with a recent electricity bill, operating hours and whether you own or lease the building.
Build fleet charging around vehicle schedules
Fleet electrification can add substantial electricity demand, but its timing determines how much rooftop solar can supply directly. Vans returning after sunset need a different charging plan from vehicles available at the depot between daytime runs.
MEG’s assessment can consider daily energy requirements, arrival and departure times, vehicle charging limits and the time available to recharge. Charger power in kW describes the charging rate; energy in kWh describes how much must be delivered.
Managed charging adjusts vehicle charging rates in response to other site loads. It can help control peak demand, but must still deliver enough energy before departure. Check combined warehouse and fleet demand against connection capacity.
Team Global Express’s depot infrastructure report published by ARENA demonstrates this approach through a mix of charging speeds, defined charging windows and load management. The appropriate combination depends on each depot’s operations.
A staged plan can reserve cable routes, switchboard space and charging bays while matching equipment purchases to confirmed vehicle deliveries. Explore MEG’s commercial EV charging solutions when planning that integration.
Assess battery storage as a separate investment
A battery can shift surplus solar into evening operation or help manage demand peaks. Its value depends on usable capacity, discharge power, losses, cycling and the tariff costs it can avoid.
Compare solar alone with solar plus storage, including the additional investment and operating costs. Moving a kilowatt-hour from export into storage also gives up its export revenue. Count that trade-off when estimating the battery benefit. Backup operation requires an appropriately designed system and defined critical loads.
What the proposed 1 MW support means
As at 18 September 2026, the Clean Energy Regulator describes proposed small-scale technology certificate (STC) eligibility for solar systems above 100 kW and up to 1 MW. The intended commencement is 1 October 2026, subject to regulations being in place.
Eligible certificates can support an upfront installation discount through an assignment arrangement. Larger solar systems can already be installed; the proposal changes access to STC support. Confirm the final requirements before relying on an incentive amount or installation date.
Read MEG’s Victorian commercial solar rebate guide for the policy detail. Any Victorian incentive or battery support should be checked separately before combining values in the business case.
MEG experience with large warehouse roofs
Working with AGL, MEG delivered the , installing 1,765 kWp before the warehouse opened. Its 1.765 MW capacity exceeds the proposed 1 MW STC threshold. This project demonstrates delivery experience; the financial model above is a separate hypothetical example.
How MEG assesses your warehouse or depot
Start with your site address, recent bills, operating hours, lease or ownership position and confirmed fleet or automation plans. MEG can help identify the interval data required; twelve months of bills is useful where available.
MEG can then compare suitable system sizes and assess roof condition, structural requirements, skylights, access, electrical infrastructure and network export limits. Delivery planning should account for loading docks, vehicle movements and necessary electrical shutdowns.
The business case should separate solar, storage and charging costs, allocate benefits and test returns against changes in occupancy, electricity demand, exports and fleet timing.
Common questions from warehouse operators
Should we cover the whole roof with solar
Only if the additional capacity has a sound business case. Compare the cost and output of each system option against usable daytime generation, export permissions and credible future loads.
Can solar serve several tenants
Potentially. The design must account for meters, ownership and the arrangement for allocating electricity and costs. A shared roof does not automatically allow generation to be credited across separate electricity accounts.
Will solar reduce demand charges
That depends on whether solar reduces the demand used to calculate the bill. An evening charging peak can remain after daytime grid purchases fall.
Assess the value of your warehouse roof
. Melbourne Energy Group can review your electricity use, site constraints and fleet plans to assess suitable solar capacity and whether storage or charging infrastructure should form part of the project.