Commercial solar can reduce the cost of running a factory when the system is sized around production demand. For Victorian manufacturers, proposed federal support for systems above 100 kW and up to 1 MW creates a reason to revisit the investment.
Commercial solar can reduce the cost of running a factory when the system is sized around production demand. For Victorian manufacturers, proposed federal support for systems above 100 kW and up to 1 MW creates a reason to revisit the investment.
The useful question is how much solar electricity your site can use during production, what that electricity costs today and how installation fits around operations. Shift patterns, weekend shutdowns and new equipment can change the result substantially.
Which manufacturing sites should assess solar
Factories with substantial daytime electricity demand are a useful starting point. Production lines, compressors, process cooling, extraction and building services can all contribute to the load that solar supplies.
Solar self-consumption is the share of generation used at your site as it is produced. When the avoided electricity usage rate exceeds the export rate, using more solar on site improves its financial value.
| Your operating pattern | What the assessment should test |
|---|---|
| Weekday daytime production | How closely solar output matches production loads, including breaks and seasonal changes. |
| Multiple shifts or continuous operation | The daytime share of demand; solar alone does not supply production after sunset. |
| Weekend or seasonal shutdowns | Surplus generation, export limits and the value of electricity exported during quieter periods. |
| New equipment or an existing solar system | How planned loads and current generation affect the case for a larger or expanded system. |
Annual electricity consumption is only the starting point. Interval meter data shows when the factory draws power and helps avoid sizing a system around demand that occurs mainly at night.
To explore your site’s fit, . Share a recent bill, your operating hours and any expansion plans so MEG can assess the next steps.
What the proposed 1 MW support changes
As at 17 September 2026, the proposed expansion of the Small-scale Renewable Energy Scheme would allow eligible solar systems above 100 kW and up to 1 MW to create small-scale technology certificates (STCs). The intended start is 1 October 2026, subject to regulations being in place, according to the Clean Energy Regulator.
STCs can be assigned to an installer or agent in exchange for an upfront discount. Systems above 100 kW can already be installed and may qualify under the Large-scale Renewable Energy Target. The proposal changes access to STC support; it does not introduce permission to install larger systems.
For eligibility and policy detail, read MEG’s . Confirm the final rules and installation timing before including a discount in an approved budget.
A worked example for a 250 kW manufacturing system
The following is a hypothetical investment model, separate from the MEG project described below. Its 250 kW capacity, 345,000 kWh annual generation and $68,000 illustrative STC discount draw on the Australian Government’s announcement. The discount is not a confirmed entitlement for an individual site.
All other figures are assumptions for this example, including the $320,000 installed cost. They are not an MEG quote or a market price guide. Amounts are excluding GST.
Assume the factory uses 80% of solar generation on site, avoiding electricity usage charges of 20 cents per kWh. The remaining 20% is exported at an assumed 4 cents per kWh, with all exports permitted and no curtailment. Allow $2,500 a year for maintenance and monitoring.
| Model input or result | Illustrative value |
|---|---|
| Installed cost before incentives | $320,000 |
| Illustrative STC discount | $68,000 |
| Net capital investment | $252,000 |
| Annual solar generation | 345,000 kWh |
| Solar used on site | 276,000 kWh (80%) |
| Avoided electricity usage charges | $55,200 a year |
| Export income | $2,760 a year |
| Maintenance and monitoring allowance | $2,500 a year |
| Net annual cash benefit | $55,460 |
| Simple payback | Approximately 4.5 years |
Simple payback divides the $252,000 net investment by the $55,460 first-year net cash benefit. It assumes that annual benefit stays constant and excludes finance, tax, panel degradation, future tariff changes and equipment replacement. No demand-charge savings, battery benefits or Victorian Energy Upgrades incentive are included.
If on-site use falls to 60%, with all other assumptions unchanged, the annual net benefit falls to $44,420 and simple payback extends to 5.7 years. The same system and incentive produce a different result because more electricity earns the lower export rate.
Actual results depend on site-specific generation, tariffs, export permissions and installation costs. Some commercial electricity contracts provide no export payment. This is why operating data should sit at the centre of the business case.
MEG manufacturing experience at Coolon LED
MEG’s published documents a 199.98 kW solar installation for a manufacturing business, using SunPower modules, Sunlock racking and Sungrow inverters. It provides a relevant example of MEG’s manufacturing delivery experience. The financial model above is not a statement of Coolon’s costs, savings or incentive eligibility.
Plan installation around production
The project assessment should address delivery as well as savings. For a working factory, this includes:
- Shutdown windows: identify electrical isolation requirements and agree suitable installation and commissioning periods.
- Roof and access conditions: assess structural suitability, roof condition, asbestos risks where relevant, and access above active work areas.
- Electrical and network requirements: check switchboards, protection, connection capacity and export conditions before finalising the design.
- Future production: allow for planned machinery, electrification, EV charging or changes to shift patterns.
If you lease the premises, landlord consent and the remaining lease term also need to fit the proposed investment.
How MEG assesses your manufacturing site
MEG starts with your electricity use and production plans. Share your site address, recent bills, operating hours and planned changes. Twelve months of bills is useful where available. MEG can then identify the interval data and site information needed to assess suitable system options.
The proposal should explain the recommended system size, expected on-site use, export assumptions, project costs and incentive eligibility. It should also identify installation constraints and show how the financial result changes if production, tariffs or export arrangements change.
Common questions from manufacturers
Can we expand an existing 100 kW system
The proposal includes eligible expansions where combined on-site capacity remains at or below 1 MW. Existing equipment, installation history and certificate arrangements need checking. A system already accredited under the Large-scale Renewable Energy Target remains under its existing arrangements.
Will solar reduce our demand charges
Only where solar reduces the demand measured under your tariff. A peak after sunset, or during low solar output, can leave the billed demand largely unchanged. Model this separately from electricity usage savings.
Can Victorian incentives be added to STC support
Potentially, subject to each scheme’s conditions. The Victorian Energy Upgrades commercial solar guidance distinguishes the deemed Part 47 activity for eligible installations of 30–200 kW from measurement and verification pathways for larger projects. A 250 kW installation should not be treated as a Part 47 project. Confirm eligibility, payment timing and interaction with the proposed STC rules before adding any VEU value to the budget.
Do we need a battery for evening production
A battery needs its own assessment of charging opportunities, discharge demand, tariffs and cost. It may support evening loads or demand management, but does not automatically make a solar project more economical. Backup capability also requires an appropriately designed system.
Assess your factory’s solar opportunity
Whether you are planning a first installation, expanding an existing system or revisiting an earlier proposal, start with the electricity your factory uses and the production you expect to run.
. Send MEG a recent electricity bill, your site location and operating hours to begin assessing system size, potential savings and the support available to your project.