Commercial Solar for Farms and Agribusinesses in Victoria
Solar STCs 100kW to 1MW
- 1 Commercial Solar for Victorian Manufacturers
- 2 Solar and Batteries for Food Processing and Cold Storage in Victoria
- 3 Commercial Solar for Warehouses and Logistics
- 4 Commercial Solar for Farms and Agribusinesses in Victoria
- 5 Commercial Solar for Aged Care Facilities in Victoria
A farm solar system earns its return through the electricity the operation can use across the year. Irrigation schedules, milking times, refrigeration and separate electricity connections determine how much solar can replace purchased power.
The expanded federal solar scheme will support eligible installations above 100 kW and up to 1 MW from 1 October 2026. That gives larger Victorian agricultural operations a reason to review solar, starting with their operating cycle.
Assess demand across a full farming season
A high annual electricity bill can hide months of low demand. A pump working intensively through summer may sit idle in winter, while a packing shed may operate only during harvest. Solar continues generating through those quieter periods.
MEG can assess interval electricity data across at least twelve months, alongside irrigation and production records. Where rainfall or crop choices vary substantially, several years of bills help test whether the model represents a typical season.
| Farm operation | What the solar assessment needs to establish |
|---|---|
| Irrigated cropping and horticulture | Pumping months, water volumes, operating hours and flexibility to use daylight generation. |
| Dairy | Milking peaks, milk cooling and hot water demand outside solar hours. |
| Poultry and intensive livestock | Ventilation, cooling and feeding loads through each production cycle, including overnight. |
| Packing sheds and produce storage | Harvest peaks, refrigeration demand and electricity use between seasons. |
The Australian Government’s agriculture energy guide identifies opportunities in pumping, dairy equipment and refrigeration. Planned efficiency upgrades should be reflected in the demand used to size solar.
Improve pumping efficiency before sizing solar
Pump condition, pressure requirements and pipework affect how much electricity is needed to deliver water. Government guidance on agricultural energy efficiency recommends checking pump performance and assessing controls such as variable-speed drives where suitable.
Then assess when pumping can occur. Filling a tank or dam during daylight may provide flexibility to irrigate later, subject to storage capacity, evaporation, water availability and the pressure needed at the crop. Changes must preserve required water delivery and crop performance.
Dairy Australia’s solar irrigation guide recommends evaluating water demand, storage and seasonal pumping together. At Wilandra Farms, an Agriculture Victoria demonstration also shows how automated irrigation can respond to available solar.
What moving irrigation into daylight is worth
Consider a hypothetical pump drawing 50 kW. Four hours of pumping moves from overnight grid electricity to otherwise-exported solar on each selected day. Assume enough surplus solar is available throughout those hours and the same water volume is delivered using the same electricity.
With an overnight usage rate of 12 cents per kWh and an export payment of 4 cents per kWh, each shifted kilowatt-hour improves the electricity cost position by 8 cents. These are illustrative rates, excluding GST.
| Annual effect of the change | 120 pumping days | 60 pumping days |
|---|---|---|
| Additional solar used on site | 24,000 kWh | 12,000 kWh |
| Overnight usage charges avoided | $2,880 | $1,440 |
| Export income given up | $960 | $480 |
| Gross annual benefit | $1,920 | $960 |
This is the additional benefit from changing the pumping schedule, before control-system costs or other operating changes. It is separate from the return on the solar installation. Demand charges, finance, incentives and tax are excluded.
The comparison shows why seasonal operating days and the actual overnight tariff matter. If cloudy conditions require daytime grid imports, the calculation must include their cost. Any demand-charge savings also need separate modelling.
To test the opportunity against your pumping schedule, . Start with your site address, a recent bill and the months your major equipment operates.
Check which electricity connections the system can serve
A dairy, house, irrigation pump and packing shed can occupy the same property but use separate electricity connections. Solar connected to one supply does not automatically offset purchases through another account.
Map the meters, switchboards, cable routes and equipment each connection supplies. A National Metering Identifier, or NMI, identifies an electricity connection; it does not by itself settle the solar system boundary for incentive eligibility.
Network approval also determines permitted exports and required controls. Rural transformer capacity and cable distances can change project cost.
Where surplus electricity cannot be used, stored or exported, solar output may need to be curtailed. Include that lost generation when comparing system sizes.
Give battery storage a defined role
A battery may shift surplus solar into evening milking or overnight refrigeration. The Australian Government’s business solar guidance recommends assessing storage against electricity use, tariffs and installation cost.
Compare solar alone with solar plus storage, allowing for battery losses, export income given up, degradation and replacement. A battery used heavily during the irrigation season may cycle much less during quieter months.
Backup power needs a separate design. Identify critical equipment, starting loads and the required operating duration. Battery power in kW determines what it can run; usable energy in kWh helps determine for how long. Existing generators need coordinated controls. A battery installation alone does not establish whole-farm backup capability.
What the 1 MW expansion means for farms
As of 21 September 2026, regulations have been amended. The Clean Energy Regulator’s transitional guidance confirms that eligible solar systems above 100 kW and up to 1 MW installed from 1 October 2026 can apply for small-scale technology certificates, or STCs.
Eligible certificate rights can be assigned in exchange for an upfront discount. Installation timing, approved equipment, installer accreditation, connection approvals and other requirements still matter. Existing and related solar systems must be considered when assessing the capacity limit.
The regulator expects certificate applications to open in mid to late November 2026. Confirm how the supplier’s quotation handles the discount and payment timing.
MEG’s provides a wider policy context. Victorian Energy Upgrades and battery incentives need separate eligibility checks before their values are included in a quotation.
MEG experience at an operating poultry farm
At a , MEG installed 96 kWp of solar and 100 kWh of usable battery storage, integrated with the existing generator. The project included a generator interlock and wireless communications between equipment across detached buildings.
Work was scheduled between poultry production cycles and around the farm’s biosecurity requirements. This project demonstrates the importance of coordinating equipment, access and farm operations. Its solar capacity is below 100 kW, so it is not an example of the expanded mid-scale STC scheme.
Plan the project around farm operations
Compare suitable shed roofs with ground-mounted options, including structural condition, shading, cable distances, productive land use and maintenance access. A larger installation area only adds value if the extra generation has a viable use.
Plan electrical shutdowns around milking, irrigation and harvest commitments. For leased land or buildings, agree ownership, access and end-of-lease responsibilities before investing. Include monitoring so the farm can track generation, imports and exports through each season.
Common questions from agricultural businesses
Can an existing farm solar system be expanded
Potentially. Under the regulator’s guidance, eligible extensions can receive STCs for the additional capacity. Combined capacity and related-system rules apply. Existing generation accredited under the Large-scale Renewable Energy Target remains in that scheme.
Does a farmhouse affect commercial solar incentives
It depends on the scheme and arrangement. Victorian Government guidance says commercial farming sites may qualify for the VEU solar activity where the system serves an eligible non-residential part of the property and is not solely for the residence.
What should we provide for an assessment
Start with recent electricity bills, the property address and a summary of seasonal operations. Add existing solar or generator details and planned equipment changes. MEG can help identify the interval data needed to compare suitable options.
. MEG can review seasonal demand, electricity connections and site conditions to assess suitable solar capacity, available incentives and whether battery storage has a clear role.