Commercial Solar for Aged Care Facilities in Victoria

Solar Series · Part 5 of 5 Solar STCs 100kW to 1MW
  1. 1 Commercial Solar for Victorian Manufacturers
  2. 2 Solar and Batteries for Food Processing and Cold Storage in Victoria
  3. 3 Commercial Solar for Warehouses and Logistics
  4. 4 Commercial Solar for Farms and Agribusinesses in Victoria
  5. 5 Commercial Solar for Aged Care Facilities in Victoria
View full series →

Commercial solar can reduce daytime electricity costs at an aged care facility when system capacity matches demand. Heating, cooling, kitchens and laundry can provide regular opportunities to use solar. Overnight electricity needs and the requirements of a live care environment must also shape the investment.

For larger Victorian facilities, the expanded federal solar scheme will support eligible installations above 100 kW and up to 1 MW from 1 October 2026. Owners and operators can assess that opportunity alongside building upgrades and plans for their wider property portfolio.

Match solar to daytime demand

Continuous operation can support substantial use of solar, but demand changes through the day. Morning heating, evening meals and overnight care may require electricity when solar production is low or unavailable.

MEG can review at least twelve months of interval electricity data, tariffs and operating schedules. This establishes when electricity is used and how summer cooling, winter heating and occupancy affect demand.

Facility service What the assessment should establish
Heating, cooling and ventilation Daytime and overnight demand, seasonal peaks and planned equipment upgrades.
Kitchen and laundry Operating hours, equipment types and any flexibility consistent with care routines.
Hot water Current fuel source, storage capacity and the effect of planned electrification.
Care and shared areas Lighting, lifts, communications and other equipment requiring continued supply.

The Australian Government’s business solar guidance recommends sizing around when electricity is used. Bed numbers and roof area provide context, but interval data is needed to estimate solar use at each facility.

Include efficiency and equipment replacement plans

The NABERS energy guide for aged care identifies heating, hot water, insulation and lighting as areas for improvement. Assess these opportunities alongside solar so the system reflects the facility’s expected future demand.

Replacing inefficient electric equipment may reduce demand. Replacing gas hot water with heat pumps can add electricity use while reducing gas consumption. Model both effects, including operating schedules and any electrical upgrades.

Some hot-water or laundry operations may fit within solar hours, but changes need agreement with facility teams. Resident comfort, ventilation, hygiene and service schedules remain part of the design requirements.

Understand what the savings figures measure

Solar self-consumption is the share of generated electricity used on site. A high percentage can support a strong return while solar supplies a smaller share of the facility’s total annual electricity.

Consider a hypothetical 300 kW system generating 400,000 kWh annually at a facility using 1,200,000 kWh a year. If the facility uses 90% of that solar directly, it consumes 360,000 kWh of solar and exports 40,000 kWh.

Assume an installed cost of $360,000 before incentives, avoided usage charges of 22 cents per kWh, an export payment of 4 cents per kWh and annual maintenance and monitoring costs of $3,000. All amounts exclude GST.

Annual measure Illustrative result*
Solar generation used on site 360,000 kWh
Facility electricity supplied by solar 30%
Electricity usage charges avoided $79,200
Export income $1,600
Net benefit after maintenance $77,800
Simple payback before incentives 4.6 years

*These are modelling assumptions, not an MEG quotation or measured project result.

Here, 90% solar self-consumption supplies 30% of annual electricity needs. Remaining grid purchases are 840,000 kWh. This assumes all surplus generation can be exported without curtailment.

Simple payback holds the first-year net benefit constant. Incentives, finance, tax, degradation, tariff changes, equipment replacement and demand-charge savings are excluded. A facility-specific business case should test these separately.

To assess your facility’s potential savings, . Share a recent electricity bill, site address and any planned building or equipment upgrades.

Assess storage and backup requirements separately

A battery can move surplus solar into evening use or help manage chargeable demand peaks. Compare its additional cost with the savings available after storage losses, export income given up and battery replacement. High daytime solar use can leave less surplus available to store.

Backup power requires a specific design. The Australian Government’s battery guidance explains that standard grid-connected solar generally shuts down during an outage, and a battery must be configured for backup.

The design should identify critical circuits, starting loads, acceptable interruptions and required operating duration. Confirm how batteries, generators and any uninterruptible power supplies work together. Energy reserved for an outage must also be reflected in the savings model; it cannot be treated as fully available for routine discharge.

Plan installation around resident care

The Aged Care Quality and Safety Commission’s environment standard emphasises safe, comfortable surroundings, suitable equipment and infection prevention. Solar works need a delivery plan that supports these requirements.

Agree the following with the facility team before installation:

  • Roof access, work areas and delivery routes that account for residents, staff, visitors and emergency access.
  • Electrical shutdown arrangements, affected equipment, temporary supply where required and authority to proceed.
  • Controls for noise, dust and contractor access, coordinated with care routines and infection prevention procedures.
  • Commissioning, staff handover, monitoring access and the process for reporting equipment faults.

Roof condition and planned refurbishment also matter. If reroofing is approaching, compare completing that work first with the cost of later removing and reinstalling solar.

MEG experience at Racecourse Grange

At , MEG delivered approximately 400 kW of solar using 672 JA Solar panels, three Sungrow SG110 inverters and Schletter mounting.

The project included removing the existing 30 kW microinverter system and installing a new solar distribution board with metering. Delivery required engineering coordination, elevated roof access and scheduling around an operating aged care facility.

Racecourse Grange predates the expanded scheme and is separate from the hypothetical financial example above.

What the 1 MW expansion changes

As at 21 September 2026, the Clean Energy Regulator confirms amended regulations for eligible systems above 100 kW and up to 1 MW installed from 1 October 2026. Eligible small-scale technology certificate rights can be assigned in exchange for an upfront discount.

Installation timing, system boundaries, existing solar, approved equipment and connection requirements still determine eligibility. Certificate applications are expected to open in mid to late November 2026, so quotations should explain discount and payment timing.

Prioritise facilities across the portfolio

Compare facilities by daytime demand, tariffs, roof life, network constraints and ownership or lease terms. Include planned refurbishments and electrification when prioritising investment.

MEG’s includes installations across multiple facilities. A staged program can establish common design, handover and monitoring requirements while assessing each site’s electricity connections and needs separately.

Common questions from aged care operators

Will solar reduce demand charges

Only where it reduces the demand used to calculate those charges. An evening or early-morning peak may remain. Read MEG’s demand charges guide for the distinction between electricity usage and peak demand.

Can we expand an existing system

Potentially. Review the existing equipment, connection approval and certificate history. Eligible extensions may receive STCs for the additional capacity, subject to combined capacity and related-system rules. Existing generation accredited under the Large-scale Renewable Energy Target remains in that scheme.

Can one system supply independently metered units

Potentially, through a suitable electrical and allocation arrangement. Retirement living units with separate accounts need a different assessment from a care home with a shared supply. Confirm which users receive the electricity and financial benefits.

. MEG can review your facility or portfolio, assess suitable solar capacity and compare the case for storage. Start with a recent bill, property details and upcoming capital works.

Shane_Smillie
Shane Smillie
Managing Director

Innovator and leader with over 15 years of extensive experience within the electrical industry. Knowledge in all aspects of business formation, development, operation, management and finance. An effective communicator and motivator with excellent time management skills, optimist attitude and calm nature. More articles by Shane Smillie