Hurstbridge Football & Cricket Pavilion Energy Resilience Project
The Hurstbridge Football & Cricket Pavilion is a shared community facility used by the Hurstbridge Football Netball Club, Hurstbridge Cricket Club and the broader community.
The project was developed to improve energy reliability, reduce electricity costs and provide backup power capability for a facility located in a region exposed to bushfire, storm and electricity network disruptions.
38.28 kWp
Nominal DC Power
Sungrow 20kW Three Phase Hybrid Solar Inverter 3 x MPPT IP65 AC With WIFI + 6x Sungrow SBH400 40kW High Voltage LFP Battery
Inverter
87 Trina 440 Watt 144 Cell VERTEX S+ Monocrystalline 30mm Black Frame N Type
Modules
Hurstbridge Football & Cricket Pavilion
Project Requirements
The project required an energy system capable of:
- Maintaining critical building services during grid outages
- Reducing electricity consumption from the grid
- Supporting Council emissions reduction objectives
- Providing battery storage and backup power capability
- Allowing temporary generator connection during extended outages
- Delivering operational monitoring and reporting
The system also needed to integrate with an active community facility used throughout the year by multiple sporting clubs and community groups.
Project Outcomes
Backup Power Capability
The pavilion can operate for a minimum of two days on critical loads during a grid outage using battery storage alone. For extended outages, a temporary generator can be connected through the installed three-phase generator connection point.
Renewable Energy Generation
The system is expected to generate approximately 55MWh to 60MWh of renewable electricity annually.
Emissions Reduction
Annual emissions reductions are estimated at approximately 50 – 55 tonnes of CO₂-e. Over the expected life of the system, total emissions reductions are projected to exceed 1,250 tonnes of CO₂-e.
Reduced Electricity Costs
The system is expected to reduce electricity costs associated with operating the pavilion, helping support ongoing facility operations and community sporting programs.
Community Infrastructure
The project provides an independently powered community facility capable of maintaining critical services during electricity outages.
The pavilion forms part of Nillumbik Shire Council’s broader approach to community resilience, infrastructure and emergency preparedness.
Project Delivery
The project was delivered through a public tender process managed by Nillumbik Shire Council.
Melbourne Energy Group worked with Council representatives, facility users, AusNet Services and project stakeholders throughout the design, installation and commissioning phases.
The scope included:
- Design and engineering
- Grid connection coordination
- Solar and battery installation
- Commissioning and testing
- Monitoring system configuration
- Operational training and handover
Council staff and facility representatives received training covering normal operation, backup power procedures and system monitoring.
Key Project Metrics
| Metric | Result |
|---|---|
| Solar PV Capacity | 38kW |
| Battery No | 6 |
| Battery Storage Capacity | 240kWh |
| Batteries | Sungrow SBH400 40kW High Voltage LFP Battery Including Accessory Kit |
| Battery Power Output | 40kW |
| Backup Power Capability | Minimum 2 days on critical loads |
| Annual Renewable Energy Generation | 55–60MWh |
| Annual Emissions Reduction | 50–55 tCO₂-e |
| Lifetime Emissions Reduction | >1,250 tCO₂-e |
| Community Opening | May 2026 |
Planning a Community Energy Resilience Project?
Talk to Melbourne Energy Group about delivering solar and battery solutions that improve energy security, reduce electricity costs and support critical community infrastructure during grid outages.
System Installed
Melbourne Energy Group designed and delivered an integrated solar and battery energy storage system comprising:
- 38kW solar PV system
- 40kW / 240kWh battery energy storage system
- Three-phase generator connection point
- Switchboard upgrades
- Grid protection equipment
- Implementation of monitoring platform
- Secure battery enclosure and construction of slab to suit
The system was configured to support critical building loads during outages while reducing ongoing electricity consumption.