Australian Unity Aged Care Mornington
Racecourse Grange Residential Aged Care Facility sought to reduce operational energy costs while strengthening its commitment to environmental responsibility. With rising electricity demands driven by 24/7 care requirements, commercial kitchens, medical equipment, and climate control systems, the facility required a robust and reliable renewable energy solution.
Our team delivered a complete 400kW solar power system designed to significantly offset grid consumption, improve long-term energy stability, and support the facility’s sustainability goals – all while ensuring minimal disruption to residents and staff.
400kW
Nominal DC Power
3 x Sungrow SG110
Inverter
672 x JA Solar JAM72D40 MB 595W + Schletter flush-mounted system
Modules
Australian Unity Aged Care Mornington
Racecourse Grange Residential Aged Care Facility – 400kW Solar Installation
The Challenge
Operating within an active aged care environment required careful planning and execution. Safety, noise management, and operational continuity were paramount. The existing 30kW micro inverter system also needed to be fully decommissioned and removed prior to the new installation.
Additionally, the scale of the new system demanded detailed engineering coordination, precise mounting solutions, and compliant metering integration to meet commercial standards.
The Solution
We installed a high-performance 400kW solar system comprising:
-
672 × JA Solar JAM72D40 MB 595W modules
High-efficiency, commercial-grade panels designed for durability and long-term output. -
3 × Sungrow SG110 inverters
Industry-leading commercial inverters delivering efficient energy conversion and system reliability. -
Schletter flush-mounted racking system
A robust, low-profile mounting solution engineered for structural integrity and long-term performance. -
PV Distribution Board (PVDB) with GMM metering
Fully integrated supply and installation, ensuring accurate monitoring and compliance.
Prior to installation, we safely decommissioned and removed the existing 30kW micro inverter system. All redundant panels were responsibly removed from site and sent for recycling, aligning with the facility’s environmental objectives.
Given the building height and roof access requirements, elevated work platforms (EWP) were utilised to ensure safe and efficient installation.
The Outcome
The completed 400kW system now delivers substantial renewable energy generation, significantly reducing the facility’s reliance on grid electricity. The result is lower operational costs, improved energy resilience, and a measurable reduction in carbon footprint.Beyond the technical achievement, the project reinforces Racecourse Grange’s commitment to responsible environmental stewardship — an increasingly important consideration for residents, families, and the wider community.
This installation stands as a benchmark example of how large-scale solar solutions can be successfully integrated into operational healthcare environments with precision, safety, and long-term performance in mind.
Project Delivery
From initial planning through to final commissioning, the project was managed end-to-end by our experienced project management team. This included:
-
System design and engineering coordination
-
Installation scheduling to minimise operational disruption
-
Electrical integration and compliance checks
-
Testing and commissioning of the complete system
Extensive testing ensured optimal performance, system safety, and seamless integration with the facility’s existing infrastructure.