Electric vehicle uptake is creating new infrastructure requirements across Australia’s aged care sector. Residential aged care facilities, retirement living communities and community care providers increasingly need to consider how residents, staff, visitors and operational fleets will charge vehicles onsite.

EVs accounted for 10.9% of new light vehicle sales in the 12 months to June 2025, with almost 128,000 vehicles sold. During the first six months of 2025, the share increased to 12.2%. As more electric vehicles enter the Australian fleet, access to charging will become an important consideration for EV charging for aged care property and transport planning.

Installing chargers without assessing how vehicles and facilities operate can create unnecessary costs, increase peak electricity demand or result in aged care EV charging infrastructure that does not meet user requirements. An effective charging strategy starts with the site’s vehicle movements, parking arrangements, electrical capacity, accessibility requirements and long-term development plans.

Why Aged Care Providers Need to Plan for EV Charging

Aged care facilities and retirement living properties are long-term assets. Infrastructure installed during new developments, car park works, refurbishments and switchboard upgrades may remain in use for decades.

EV charging demand can develop across several areas of an aged care organisation.

User group Likely charging requirement Main planning consideration
Residents Regular charging while vehicles are parked overnight or for extended periods Individual access, parking allocation and electricity billing
Staff Charging during shifts Shift patterns and simultaneous charging demand
Visitors Short- or medium-duration charging Access controls, parking duration and payment arrangements
Home care fleet Scheduled charging between service periods Daily travel, return times and vehicle availability
Community transport Reliable charging for larger or intensively used vehicles Battery capacity, turnaround time and operational priority
Pool and maintenance vehicles Overnight or workplace charging Predictable departure schedules and daily energy requirements

Each group has a different parking duration and charging priority. A resident’s vehicle may remain parked overnight, while a community transport vehicle may need to return to service within a limited period. The charging system should reflect these operational differences.

Resident EV Charging

Retirement living and independent living residents may keep their vehicles onsite for extended periods. This makes managed AC charging suitable for a significant proportion of resident EV charging requirements.

Planning needs to address:

  • Whether parking spaces are allocated or shared
  • Whether charging equipment is located on private or common property
  • How residents activate the chargers
  • How electricity consumption is measured and billed
  • Who owns and maintains the equipment
  • How new chargers will be approved and connected
  • Whether the system can support future residents without repeated electrical upgrades

Installing separate, unmanaged chargers as individual requests arise can place pressure on the site’s electrical infrastructure. A coordinated system allows available capacity to be distributed across multiple vehicles and provides a consistent approach to access, billing and maintenance.

Staff and Visitor Charging

Staff vehicles may remain onsite for an entire shift, providing a suitable charging window for AC chargers. EV charging can also support employees who cannot install a charger at home, including people living in apartments or rental properties.

Demand may be concentrated around shift commencement and changeover periods. If several vehicles begin charging simultaneously, the combined electrical load can be substantial.

Visitor charging requires a different approach. Operators need to determine whether chargers will be:

  • Restricted to approved users
  • Available to residents and visitors
  • Provided as a complimentary amenity
  • Operated as a paid service
  • Available during specified hours

Charger positioning should not interfere with resident drop-off areas, accessible parking, emergency access, deliveries or pedestrian movement.

Charging Operational and Community Care Fleets

aged care fleet charging should be planned around service delivery rather than charger output alone.

An aged care fleet assessment should consider:

  • Number and type of vehicles
  • Daily travel distance
  • Vehicle battery capacity
  • Energy used during each operating period
  • Return and departure times
  • Time available for charging
  • Vehicle utilisation across different shifts
  • Seasonal or irregular transport requirements
  • Future fleet replacement schedules

A home care vehicle returning to a depot overnight may have sufficient time to recharge using AC infrastructure. A community transport vehicle with a larger battery and a short turnaround window may require higher-powered AC charging or DC fast charging.

Fleet vehicles should also be prioritised within the charging system. A resident or staff vehicle parked for several hours can charge more gradually, allowing available capacity to be directed to vehicles with scheduled departures.

Selecting AC or DC Chargers

The appropriate charger depends on the required energy and the time available to deliver it.

Charging option Suitable aged care application Main consideration
Lower-powered AC charging Residents, staff and vehicles parked overnight Suitable for long parking periods and lower daily energy requirements
7 kW AC charging Residents, staff and lower-use fleet vehicles Requires suitable single-phase capacity
Up to 22 kW AC charging Fleet vehicles requiring more energy within a shorter period Requires compatible vehicles and suitable three-phase capacity
DC fast charging High-utilisation community transport or fleet vehicles Higher equipment, installation and electrical capacity requirements
Mixed AC and DC system Larger facilities supporting multiple user groups Allows charging speed to be matched to operational priority

A 22 kW charger does not necessarily mean that every connected vehicle will charge at 22 kW. Charging performance is influenced by the vehicle’s onboard charger, battery condition, available site power and charging-system configuration.

Installing the highest-powered charger at every parking space is unlikely to be necessary. The objective is to provide enough energy before each vehicle’s next required departure.

Assessing Electrical Capacity

An EV charger introduces a new electrical load to a facility that already supports essential services and continuous services.

Aged care sites may operate:

  • Heating and cooling systems
  • Commercial kitchens
  • Electric hot water
  • Laundry equipment
  • Lifts
  • Medical and care equipment
  • Lighting and security systems
  • Communications infrastructure
  • Nurse call and monitoring systems

Before chargers are selected, a site assessment should examine:

  • Main switchboard and distribution-board capacity
  • Existing maximum demand
  • Available supply capacity
  • Electricity consumption across the day
  • Peak demand periods
  • Proposed charger locations
  • Cable routes and installation distances
  • Metering and communications requirements
  • Potential switchboard or network upgrades
  • Capacity for future charger expansion

Commercial properties may have three-phase electricity capable of supporting higher charging outputs, but the presence of three-phase power does not confirm that sufficient capacity is available. The existing load and electrical infrastructure must be assessed by a suitably qualified electrical contractor.

Interval electricity data can assist with identifying when spare capacity is available and whether charging can be scheduled outside the facility’s higher-demand periods.

Protecting Essential Services

Aged care facilities provide continuous services that cannot be treated in the same way as a standard workplace electrical load. EV charging should remain subordinate to essential building operations.

The charging system should allow facility management to:

  • Reduce or suspend charging during periods of high building demand
  • Prioritise essential operational vehicles
  • Isolate chargers during a fault or emergency
  • Maintain reserved capacity for critical building systems
  • Prevent charging from affecting backup generator operation
  • Override automated charging schedules when required

Where the site transfers to backup generation, charging may need to be disconnected or reduced automatically. EV chargers should not consume capacity required by critical care, communications, lighting, security or other essential building systems.

These requirements should be established during electrical design rather than addressed after the chargers have been commissioned.

Australian Unity Aged Care Mornington

Australian Unity Aged Care Mornington

Using Load Management to Control and Prioritise Charging

A load management system adjusts vehicle charging according to the facility’s available electrical capacity.

A managed system can:

  • Reduce charger output when building demand increases
  • Prevent all chargers from operating at maximum output simultaneously
  • Distribute capacity across connected vehicles
  • Prioritise community transport and home care vehicles
  • Reserve capacity for vehicles required for urgent or unscheduled use
  • Schedule resident and staff charging during lower-demand periods
  • Increase charging when onsite solar generation is available
  • Allow facility management to override automated schedules

Priority rules should reflect vehicle operations. A community transport vehicle required early the following morning may receive charging priority over a staff or resident vehicle parked for a longer period.

The communications infrastructure supporting load management also requires early planning. Large car parks, basement areas and detached parking structures may have limited wireless coverage. Wired communications can provide greater reliability and security where the system controls a significant electrical load.

Load management may allow more chargers to operate within the site’s available capacity, but it does not remove the need for a detailed electrical assessment.

Integrating EV Charging with Solar and Battery Storage

Aged care facilities can have substantial daytime electricity consumption, creating opportunities to coordinate EV charging with solar and battery storage.

Vehicles connected during daylight hours may use available solar generation that would otherwise be exported to the grid. Charging schedules can be adjusted to direct more energy to staff or fleet vehicles during solar production periods.

Battery storage may provide additional flexibility by storing solar generation or grid electricity for later use. Depending on the site’s tariff and load profile, a battery may help:

  • Supply charging outside solar production hours
  • Manage increases in peak demand
  • Support a broader site energy-management strategy
  • Increase onsite use of renewable electricity

Solar, battery storage and EV charging should be assessed as an integrated system. Installing each technology independently can result in duplicated equipment, incompatible controls or infrastructure that does not make effective use of onsite generation.

Accessibility and Inclusive Charger Design

Accessibility is particularly important in aged care and retirement living environments. Residents, visitors and staff may have reduced mobility, limited strength or dexterity, impaired vision, or rely on wheelchairs and other mobility aids.

An accessible EV charging bay involves more than allocating an accessible parking space. The user must be able to reach the charger, handle the cable, connect the vehicle, operate the controls and complete any identification or payment process.

Planning should consider:

  • Parking-bay dimensions and adjacent circulation space
  • Level, firm and slip-resistant surfaces
  • Gradients and crossfalls
  • Unobstructed access between the vehicle and charger
  • Space for wheelchairs, walking frames and other mobility aids
  • Different vehicle charging-port locations
  • Charger-control and connector heights
  • Cable weight and operating force
  • Screen visibility and accessible controls
  • Lighting, signage and wayfinding
  • Safe pedestrian access to the facility
  • Protection from vehicle impact

Cables should not cross walkways or create trip hazards. Cable-management systems, such as retractors or overhead supports, may make heavier charging cables easier to handle while keeping them clear of the ground.

Austroads provides the following component-height guidance for inclusive charger design.

Charging component Recommended height
Controls requiring grasping or turning 900–1,100 mm
Push controls 900–1,200 mm
Touch controls 900–1,250 mm
Charger socket outlet 800–950 mm
Screen or visual interface 800–1,200 mm

Controls should be operable with one hand and should not require tight grasping, pinching or wrist twisting. Charger selection should also account for the strength required to handle cables, remove connectors and operate covers.

Screens and instructions should use clear language, high colour contrast and readable text. Physical, illuminated buttons can improve usability where touchscreen controls are difficult to operate. A clearly displayed support number should be available where users may require assistance.

Bollards and wheel stops must protect equipment without blocking wheelchair access or preventing users from reaching the charger.

Applicable accessibility, building and parking requirements should be confirmed for each project. The Austroads report provides current design guidance, but some recommendations have not yet been adopted as mandatory national standards.

Billing, Access and System Administration

Facilities supporting several user groups may require networked chargers that can identify users, record electricity consumption and control access.

Access and administration options can include:

  • RFID cards
  • Mobile applications
  • Resident or staff accounts
  • Fleet identification
  • Payment terminals
  • Centralised billing platforms
  • Charging and energy-use reports

The operator should determine:

  • Who is authorised to charge
  • Whether electricity will be provided free or at a cost
  • Whether different user groups require different rates
  • Who will create and maintain user accounts
  • How residents will be billed
  • Who will respond to equipment or software faults
  • How charging activity will be reported
  • What ongoing software, payment and connectivity costs apply

Reliable communications are required where chargers depend on Wi-Fi, mobile data or ethernet for access control, monitoring and billing.

Cybersecurity and Charging-System Governance

Networked chargers can connect to payment platforms, user accounts, building systems and third-party charge point operators. This creates operational and cybersecurity requirements that need to be addressed during procurement.

The aged care provider should establish:

  • Who owns and controls charging data
  • Which external parties can access the system
  • How software and security updates will be managed
  • Whether chargers continue operating if internet access is interrupted
  • How user and payment information is protected
  • Who can remotely start, stop or alter charging
  • How faults or unusual activity will be identified
  • Whether chargers can be locally isolated
  • How access permissions are removed when staff or residents leave

Equipment should support secure configuration, controlled administrator access, strong passwords, encryption and regular software updates. Responsibilities should be documented where the charging system is operated or maintained by a third party.

Wired communications may be preferable for critical fleet and load-management functions. Wireless connectivity can still support selected applications, but its reliability and security need to be assessed against the facility’s operating requirements.

Maintaining Aged Care Operations During Installation

Charging infrastructure must be installed without compromising resident safety, essential services or facility access.

Project planning may need to address:

  • Continuous resident, staff and visitor access
  • Noise and working-hour restrictions
  • Temporary parking changes
  • Pedestrian and vehicle separation
  • Ambulance and emergency access
  • Deliveries and waste collection
  • Planned electrical shutdowns
  • Infection prevention requirements
  • Resident and family communication
  • Fire detection and evacuation arrangements
  • Temporary isolation of work areas

Electrical outages should be scheduled with facility management and assessed against essential-service requirements. Work affecting switchboards, backup power or building-management systems may require additional engineering and operational controls.

Installation should follow a structured process covering site assessment, system design, procurement, construction, testing, commissioning and handover.

Handover documentation should include:

  • Electrical safety and commissioning records
  • Charger and load-management operating instructions
  • Emergency isolation procedures
  • Fire and emergency information
  • Warranty documentation
  • Preventive maintenance requirements
  • Software and connectivity information
  • User and administrator training
  • Fault reporting and support contacts

Fire Safety and Emergency Planning

EV charging infrastructure must be incorporated into the facility’s broader fire safety and emergency-management arrangements.

The design should be reviewed against applicable building, electrical and fire-safety requirements, including relevant guidance from the Australian Building Codes Board and the Australasian Fire and Emergency Service Authorities Council.

Planning considerations include:

  • Locating chargers away from evacuation routes
  • Maintaining access for emergency and towing vehicles
  • Protecting chargers from vehicle impact
  • Providing clearly identified electrical isolation controls
  • Including charger locations on fire and emergency plans
  • Positioning equipment away from medical gases, fuel storage, substations and combustible materials
  • Coordinating charger placement with hydrants, ventilation and fire-detection systems
  • Providing signage for charging areas and isolation points
  • Enabling remote disconnection where supported
  • Consulting relevant fire authorities for larger installations

Basement and enclosed car parks require additional consideration because charger placement can interact with ventilation, fire detection, sprinkler systems, emergency access and smoke movement.

Fire-safety requirements should be determined by appropriately qualified practitioners for the specific building. Generic charger-placement guidance should not replace a site-specific fire and building assessment.

Planning for Future Bidirectional Charging

bidirectional charging allows electricity to flow both into and out of an EV battery. Depending on the system, energy may be supplied to a building, an isolated electrical system or the electricity grid.

Potential applications include:

  • Vehicle-to-grid: exporting electricity from the vehicle to a grid-connected electrical system
  • Vehicle-to-building: supplying energy to a building or local electrical system
  • Vehicle-to-load: directly powering compatible appliances or equipment

The National Roadmap for Bidirectional EV Charging identifies the potential for EV batteries to absorb surplus solar generation and provide power during higher-demand periods. It also identifies continuing requirements involving compatible vehicles, charging equipment, connection processes, interoperability standards and market arrangements.[4]

Aged care providers should treat bidirectional charging as an emerging planning consideration rather than assume it can currently provide facility backup power. Any resilience application would require detailed engineering and must not be represented as a substitute for compliant emergency and essential-power systems.

Selecting expandable electrical and future-ready charging infrastructure may give facilities greater flexibility as compatible vehicles, chargers and connection arrangements become more widely available.

Staging the Infrastructure

Charging demand is unlikely to reach its long-term level immediately. Installing every anticipated charger at the start of the project may not be necessary.

A staged strategy can begin with priority chargers while preparing the site for expansion through:

  • Appropriately sized switchboards
  • Spare circuit capacity
  • Underground conduits
  • Cable pathways
  • Communications infrastructure
  • Reserved equipment locations
  • Expandable load-management systems
  • Space for protective devices and electrical isolation
  • Fire detection and emergency-planning provisions
  • Accessible circulation areas around future chargers
  • Parking layouts that accommodate additional and accessible charging bays

New developments, car park upgrades and major electrical works provide an opportunity to install enabling infrastructure before surfaces and landscaping are completed. This can reduce future civil works, operational disruption and installation costs.

Developing an Aged Care EV Charging Plan

A practical plan should follow nine stages:

  1. Identify users Determine the requirements of residents, staff, visitors and operational fleets.
  2. Consult stakeholders Involve facility management, care operations, fleet managers, property teams, accessibility representatives, IT and emergency-management personnel.
  3. Review vehicle movements Assess arrival times, departures, daily travel, parking duration and operational priority.
  4. Calculate charging requirements Establish how much energy each vehicle requires and the time available to supply it.
  5. Assess the site Review electrical capacity, switchboards, maximum demand, parking areas, cable routes, communications and potential civil works.
  6. Review accessibility and safety Assess circulation space, equipment reach, cable handling, lighting, signage, evacuation routes and emergency access.
  7. Design the system Select the appropriate combination of AC and DC chargers, load management, access controls, billing and communications.
  8. Plan delivery and operations Establish shutdown arrangements, construction controls, commissioning, maintenance, cybersecurity, emergency procedures and staff responsibilities.
  9. Prepare for expansion Determine when additional chargers may be required and install enabling infrastructure where justified.

Frequently Asked Questions

How many EV chargers does an aged care facility need?

The number depends on resident uptake, staff demand, fleet size, visitor policy and parking duration. The assessment should distinguish between chargers required immediately and infrastructure needed for future expansion.

Are AC chargers suitable for aged care facilities?

AC charging can support residents, staff and fleet vehicles parked for several hours. The correct output depends on the vehicle’s energy requirement, charging capability and available time before departure.

When should an aged care provider consider DC fast charging?

DC charging may be appropriate for high-utilisation fleet or community transport vehicles with limited turnaround times. Its higher electrical capacity and infrastructure requirements need to be justified by the operating schedule.

Can multiple chargers operate without upgrading the electricity supply?

Load management may allow several chargers to share available capacity. A site assessment is required to establish whether the existing supply and switchboards can support the proposed installation.

Can residents and staff be billed for charging?

Compatible networked chargers can identify users and record electricity consumption. The aged care provider must establish its pricing, access, administration and support arrangements before selecting the charging platform.

What makes an EV charger accessible?

An accessible charger must be reachable and operable by people with different physical, sensory and cognitive abilities. This includes adequate circulation space, suitable component heights, manageable cables, accessible controls, clear instructions, effective lighting and an unobstructed route between the parking bay and charger.

Do EV chargers create additional fire-safety requirements?

The charging installation must be considered within the building’s existing fire and emergency systems. Requirements depend on the number of chargers, their location, the building type and applicable fire engineering. Basement and enclosed parking areas may require additional assessment.

Can EV chargers affect an aged care facility’s essential power?

They can if electrical demand and emergency operating modes are not properly managed. The system should include controls that reduce, disconnect or isolate charging when capacity is required for essential facility services.

Do connected chargers create cybersecurity risks?

Networked chargers introduce external communications, software and user-access requirements. Secure configuration, controlled administrator access, regular updates, reliable communications and clearly assigned responsibilities should form part of procurement and ongoing system management.

Can EVs provide backup power to an aged care facility?

Bidirectional charging could eventually allow compatible EVs to supply electricity to buildings or the grid. Current availability depends on compatible vehicles, charging equipment, connection requirements and system design. It should not be relied upon as a replacement for compliant essential-power infrastructure.

Preparing Aged Care Properties for Electric Vehicles

EV charging is becoming part of long-term infrastructure planning for aged care and retirement living properties. The right solution is determined by vehicle movements, parking duration, electrical capacity, accessibility requirements and operational priorities.

Early planning allows providers to introduce chargers progressively while preparing switchboards, cable routes, communications and management systems for future demand. It also creates an opportunity to coordinate charging infrastructure with solar, battery storage and broader energy-management measures.

Melbourne Energy Group can assess an aged care facility’s electrical infrastructure, energy profile and vehicle requirements to develop an EV charging solution aligned with current operations and future expansion.

Shane_Smillie
Shane Smillie
Managing Director

Innovator and leader with over 15 years of extensive experience within the electrical industry. Knowledge in all aspects of business formation, development, operation, management and finance. An effective communicator and motivator with excellent time management skills, optimist attitude and calm nature. More articles by Shane Smillie