Commercial Solar Rebate Victoria 2026: SRES Expands to 1 MW
A major change to Australia's renewable energy incentive framework could improve the business case for larger commercial solar projects.
- Direct answer: The Australian Government intends to expand SRES eligibility for solar PV from 100 kW to 1 MW for systems installed from 1 October 2026. The change could provide eligible Victorian businesses with an upfront STC-based discount of around 20%, but it remains subject to regulations being in place.
Commercial solar SRES expansion at a glance
- Maximum proposed SRES solar PV capacity: 1 MW, increased from 100 kW.
- Intended commencement: eligible systems installed from 1 October 2026.
- Indicative support: around 20% of eligible mid-scale solar installation costs.
- Current status: announced by the Australian Government but subject to regulations being made.
A major change to Australia’s renewable energy incentive framework could improve the business case for larger commercial solar projects.
On 5 August 2026, the Australian Government announced its intention to increase the solar photovoltaic system threshold under the Small-scale Renewable Energy Scheme (SRES) from 100 kilowatts (kW) to 1 megawatt (MW).
The government intends the change to apply to eligible mid-scale solar installed from 1 October 2026. At the time of publication, however, the required regulations are not yet in place.
For Victorian manufacturers, farms, warehouses, shopping centres, councils, community organisations and other high-energy users, the proposed expansion may materially change project sizing, capital requirements and payback calculations.
- Key point: Businesses researching the commercial solar rebate in Victoria should understand that the announced change is not a separate Victorian grant or guaranteed cash payment. Eligible projects would create Small-scale Technology Certificates, which are commonly assigned to a registered agent in return for an upfront discount.
What is changing under the SRES?
The Small-scale Renewable Energy Scheme (SRES) currently supports eligible small-scale renewable energy systems, including solar PV systems with a capacity of no more than 100 kW. Larger systems generally sit within the Large-scale Renewable Energy Target (LRET), where eligible generation may create Large-scale Generation Certificates over time. Under the announced expansion, new solar PV installations up to 1 MW would move into the SRES framework.
This would allow eligible mid-scale systems to create Small-scale Technology Certificates (STCs) and bring forward the value of scheme support at installation. For further background, see Renewable Energy Target explained: STCs, LGCs and renewable energy rebates.
- Current solar PV threshold: up to 100 kW under the SRES.
- Announced solar PV threshold: up to 1 MW for eligible new installations.
- Intended commencement: systems installed from 1 October 2026, subject to regulations being in place.
- Existing LRET projects: systems already supported under the LRET would remain in that scheme.
- Projects above 1 MW: new systems above the proposed threshold would continue to be considered under the LRET.
How much support could an eligible project receive?
The Department of Climate Change, Energy, the Environment and Water indicates that SRES support would generally provide around a 20% discount on the upfront installation cost of an eligible mid-scale solar PV system. This is an estimate, not a fixed rebate rate.
The department’s 2026 examples for a zone 3 location – which includes Melbourne – estimate a discount of approximately $68,000 for a 250 kW system and $136,000 for a 500 kW system. Actual value will depend on the final regulations, certificate calculations and market price, as well as the project’s location, design, equipment and installation date. Businesses should also separate the incentive value from projected electricity savings. The government fact sheet gives an illustrative 250 kW system producing about 345 MWh a year and avoiding electricity charges of around 15 cents per kWh.
On those assumptions, annual electricity cost savings could be around $50,000. Site-specific results will vary with interval data, operating hours, tariff structure, export limits, system performance and future electricity prices.

Commercial Solar in Victoria
Which Victorian projects may benefit?
The proposed expansion is most relevant to sites whose load and available installation area support systems larger than 100 kW. Examples include:
- industrial and manufacturing facilities with substantial daytime electricity demand
- cold stores, food processors and logistics centres
- farms, irrigation operations and agricultural processing facilities
- commercial property portfolios, shopping centres and large-format retail
- schools, sporting facilities, community organisations and local government sites
- businesses considering electrification or battery storage as part of a staged energy plan
A larger incentive threshold does not mean the largest possible system will deliver the best commercial outcome.
Appropriate capacity should be determined through analysis, operational plans and financial modelling as part of a considered commercial solar system design.
Proposed eligibility and compliance requirements
The government fact sheet identifies several intended requirements for mid-scale solar. Final requirements will depend on the regulations and subsequent Clean Energy Regulator guidance.
- New installations would have a maximum system size of 1 MW.
- For an expansion to an existing system, combined capacity would be limited to 1 MW.
- Installer and product accreditation requirements under the SRES would apply.
- A written installer statement would be required.
- Projects would need to comply with Victorian electrical safety and planning requirements.
- Relevant network connection agreements and approvals would remain necessary.
- Technical documentation, including engineering reports and evidence of connection approval, may be required in a similar way to current LRET projects.
How to prepare your commercial solar project before 1 October 2026
Melbourne Energy Group can assess your electricity use, site infrastructure and network requirements to determine the appropriate commercial solar system size for your business.
You do not need to size the system, model the incentive or manage the technical approvals yourself.
Starting this work before the proposed SRES expansion takes effect can help your business understand the opportunity and prepare for delivery while the final regulations are confirmed.
Our commercial solar solutions cover feasibility, design, delivery and ongoing system management.
1. Provide your electricity data and project objectives
Melbourne Energy Group will review your interval electricity data, tariffs, demand charges, operating hours and seasonal consumption.
This analysis determines how much solar electricity your site can use and provides the basis for recommending an appropriate system size.
Your operational plans will also be considered, including expected business growth, equipment upgrades, electrification, battery storage or increased electricity demand.
2. Have a complete a site and infrastructure assessment
The proposed system must be suitable for the building and its electrical infrastructure. Melbourne Energy Group will assess the available roof or ground area, shading, structural considerations, switchboards, transformer capacity, fire access and other site constraints. Identifying these requirements early reduces the likelihood of design changes, unexpected costs or delays later in the project.
3. Review commercial & sustainability business case
Once the site and energy data have been assessed, Melbourne Energy Group can compare suitable system sizes and prepare a site-specific business case. The assessment can include:
- Estimated project cost and available STC support
- Expected solar generation and self-consumption
- Forecast electricity and demand-charge savings
- Export assumptions and network constraints
- Maintenance and system degradation
- Financing options and indicative payback
- Sensitivity to future electricity prices
This allows your business to evaluate the project using assumptions that reflect its actual operations rather than relying on general rebate or savings estimates.
How the change fits into a broader energy strategy
Solar should be assessed as one component of an integrated energy program.
For some sites, demand management, power factor correction, building controls, efficient equipment, electrification, battery storage or electricity procurement changes may alter the preferred solar design.
Businesses meeting the existing criteria may also be able to access support for eligible battery systems under the Cheaper Home Batteries Program. The current settings cover battery systems between 5 kWh and 100 kWh, with certificate support capped at the first 50 kWh of usable capacity. Battery eligibility and sizing should be assessed separately from the proposed mid-scale solar expansion.
Prepare now and confirm eligibility
The proposed SRES expansion could remove a significant upfront-cost barrier for mid-scale commercial solar in Victoria. Its practical value will depend on the final regulations, certificate market conditions and the quality of each site’s technical and financial assessment.
Melbourne Energy Group helps commercial, industrial and public-sector organisations assess energy use, define renewable energy opportunities and plan technically compliant projects around operational and financial objectives.
Explore our energy solutions for commercial organisations and selected commercial solar projects. Organisations considering solar above 100 kW can begin feasibility, network and business-case work now, then confirm procurement and installation decisions against the final Clean Energy Regulator requirements.
Planning a commercial solar project between 100 kW and 1 MW? Melbourne Energy Group can assess your electricity profile, site constraints, network requirements and available incentives before you commit to a system design. Discuss a commercial energy assessment with our team.
Frequently asked questions
Is the 1 MW commercial solar incentive already available?
No. The Australian Government announcement was made on 5 August 2026 and is intended to apply to eligible systems installed from 1 October 2026. The change remains subject to regulations being made. Businesses should confirm the final rules before committing to an installation date or certificate value.
Does the expanded SRES support a cash rebate?
Not in the usual sense. An eligible solar PV system would create Small-scale Technology Certificates. The system owner can assign the right to create those certificates to a registered agent, commonly in exchange for an upfront discount on the project price. The value is not a fixed government cash payment.
How much could a 250 kW or 500 kW solar system receive?
The government’s 2026 zone 3 examples estimate approximately $68,000 for a 250 kW system and $136,000 for a 500 kW system. Melbourne is within zone 3. These are indicative examples only; actual support will depend on the final regulations, certificate calculation, market value, system design, location and installation date.
Can an existing commercial solar system be expanded under the proposed rules?
The government fact sheet states that an expansion may qualify where the combined capacity of the existing and expanded system does not exceed 1 MW and all other eligibility requirements are met. Expansions to generation units already registered under the LRET would remain under that scheme.
Would a commercial battery qualify for additional support?
Possibly. Businesses can access the Cheaper Home Batteries Program where the existing criteria are met. Eligible battery systems must be between 5 kWh and 100 kWh, with support capped at the first 50 kWh of usable capacity. Battery eligibility is separate from the proposed mid-scale solar change.
Should a Victorian business wait until the regulations are final?
A business does not need to delay feasibility work. Load analysis, site assessment, network enquiries, structural review and financial modelling can begin now. Procurement and installation commitments should preserve flexibility until the regulations and Clean Energy Regulator guidance confirm eligibility, documentation and commencement arrangements.